CLEMSA

Water Offtake Agreements

Your water, secured. Delivered per kilolitre.

A groundwater supply on your site, built, owned, licensed and operated by CLEMSA, with municipal water kept as backup. You pay for water delivered, not for a plant.

Request an indicative proposal All we need is 12 months of water bills and a site plan.
R0capital outlay. We finance, build and own the plant.
Per kLtariff, benchmarked against your municipal bill.
5–9 monthsfrom first conversation to first water.
Water, a treatment plant drawing and a filter bed

Compliance & Lifecycle Engineering for Municipal Sustainable Assurance

Drilling & Water Supply
Water Filtration & Plant Construction
Operations & Maintenance
Reporting & Analytics
Compliance & Assurance

The problem

Your water is your problem now

Municipal supply is failing, and the law makes your own supply your liability. A site that answers with a borehole becomes a water services intermediary: SANS 241 monitoring, municipal approval and a national licence all become yours. Most never finish the job.

Level 2Johannesburg water restrictions from 21 November 2026, with demand above the city's Rand Water allocation.
RationedeThekwini: intermittent supply and repeated failures in the northern areas.
National disasterEastern Cape drought, including Nelson Mandela Bay, classified in February 2026.

Sources: Daily Maverick, 20 November 2026; eThekwini Municipality; SAnews, 18 March 2026.

The offer

Water delivered, per kilolitre, lawfully

We build, own, license and operate a groundwater supply on your site. You sign a Water Offtake Agreement and pay for the water you receive.

No capital outlay

CLEMSA finances, builds and owns the plant.

Per-kilolitre tariff

Benchmarked against your municipal bill, escalating at CPI.

Backup retained

Your municipal connection stays live through a backflow preventer.

Fully licensed

Water Use Licence, municipal approval and Water Safety Plan carried by us.

Monthly proof

Volumes, quality, compliance status and every regulator submission in one statement.

Monitored in-line

EC, pH, turbidity and free chlorine probes, flow meters and borehole level loggers on telemetry.

What goes on your site

Five parts, sized to your demand

You do not need the engineering. You need to picture it and know what will be on your property: a 6 to 12 metre container plus tanks.

Source

One to six production boreholes, each with a flow meter and water-level logger, pumped continuously at a sustainable rate. A good borehole yields 1 to 3.5 L/s, or 85 to 300 kL a day.

Treatment

A packaged plant: aeration and oxidation, iron and manganese removal, filtration, disinfection and stabilisation. Saline water adds reverse osmosis.

Storage

Buffer tanks and a product reservoir, usually yours, holding a day or more of supply so a plant fault never becomes an outage.

Connection and backup

Booster pumps deliver into your reticulation. The municipal connection stays in place behind a backflow preventer.

Monitoring

In-line EC, pH, turbidity and free chlorine, meters on every line, all on telemetry, with daily site checks on our app.

Compliance

Three legal links. We carry all of them.

The moment a site supplies treated water to people who are not the owner, the law treats it as a water services intermediary. That creates a chain of obligations most borehole installers cannot meet.

What is coming. The Water Services Amendment Bill (B24-2025) creates a licensing regime for water services and registration for the people who install and operate the works. Choose an operator who will still be licensed in three years.

How a project runs

First conversation to first water in five to nine months

The licence follows its own timetable and is lawfully bridged. Durations are typical; drilling and authorisation vary most.

  1. Qualify

    1–2 weeks

    Site visit. Is there a real cost of failure, land, space and sewer for backwash?

  2. Feasibility

    2–4 weeks

    Hydrocensus, demand analysis, indicative yield and tariff. Ends in an indicative proposal.

  3. Drill and test

    6–10 weeks

    Boreholes sited, drilled and pump-tested; raw-water SANS 241 analysis. Go or no-go for both sides.

  4. Authorise

    in parallel

    Intermediary application and Water Safety Plan to the municipality; licence or General Authorisation to the Department.

  5. Design and sign

    4–8 weeks

    Process, civil and electrical design; the Water Offtake Agreement.

  6. Build

    8–16 weeks

    Civils, equipping, plant, pipework, telemetry and commissioning.

  7. Prove

    30 days

    A run test on quality and volume before the first invoice.

  8. Operate

    for the term

    Daily checks, laboratory protocol, maintenance, and monthly reports to you and the regulators.

The agreement

What you sign and what you pay

You pay

A tariff per kilolitre delivered
Benchmarked against municipal water, escalating at CPI.
A minimum monthly offtake
Set below your average demand.
Nothing up front
Feasibility drilling on terms agreed before we start.

You get

SANS 241 water into your existing reservoir
Continuously, with municipal backup retained.
Every approval, in place and maintained
Licence or General Authorisation, municipal approval, Water Safety Plan reviewed annually.
Monitoring and response
In-line probes, daily checks, an accredited laboratory protocol and immediate isolation on a health exceedance.

Who it is for

Sites where an outage costs more than the water

Private hospitals and frail care

Water is a patient-safety issue.

Food, beverage and agri-processing

Production stops without potable water.

Cold storage, data centres, laundries

Uptime-critical operations.

Estates and retirement villages

Large, steady demand on owned land.

Shopping centres and office parks

Tenants and trading hours depend on it.

Hotels, campuses and student housing

Resident populations and duty of care.

Who we are

A team that has done all of it before

CLEMSA was built by people who have been building, licensing and operating groundwater supply schemes for critical facilities since the Day Zero drought. You meet the operations and engineering leads at the site visit.

Operations and projects

More than fifty water treatment plants designed, built and operated, including upgrades to plants above 500 kL a day.

Engineering and process

Engineer and WISA-registered process controller, on critical-facility groundwater sites since 2017.

Monitoring and compliance

Field coordination of a programme of 94 facilities, 177 boreholes and 57 water use licences; builds our telemetry and reporting platform.

Water safety and risk

Founder and former managing director of an established water treatment and supply company.

Next step

Send us twelve months of water bills and a site plan

You receive an indicative proposal within four weeks: likely yield, treatment, tariff per kilolitre and term.